Northam Waste Transfer

Project Description

Upgrade and extension to existing shed includes pipe works, electrical, steel work and carpentry.

Scope of Works

  • Import and install fill 14,500 m3
  • Pavement construction 380mm depth includes primer seal and asphalt 4100m2
  • Unsealed pavement construction at 250mm depth 2175m2
  • Supply and install bollards, line marking, wheel stops and kerbing
  • Supply and install RC retaining wall throughout.
  • Supply and install 60lm of RCP pipe
  • Supply and install guard rails