Consulting with Engineer and Main Roads WA to modify spray seal installation due to cold
weather condition.
Modifying headwall construction from pre-cast to in-situ when advised by Main Roads WA.
Scope of Works
Cut and prepare subgrade
Loading and cartage of 2600m3 from
Shire’s gravel pit.